Saturday, July 9, 2011

Mindless Knitting



We knitters, being normal humans, like to classify our world. The yarn and projects we have are classified as stash, UFOs, and WIPs, and become FOs when they go out of the project room and into the closet or into a gift recipient's hands. We also tend to classify the difficulty of our projects.


Currently, I am on a mindless knitting jag. I have a mindless portable project, perfect for bringing along for car rides and endless soccer/hockey/name-your-sport games. This cowl is in Noro Chirimen (a finer gauge version of Taiyo) and is a 2 row lace pattern that is a 3 stitch repeat. You can't get much simpler than that, and since it is a one ball project, it certainly qualifies as portable. My rule for mindlessness in portable projects is that I need to be able to figure out where I am in the pattern within a minute of putting the project in my hands. This guy falls into the 10 second category. The other qualification (which also goes for the nonportable projects) is that I should be able to avoid staring at my knitting. I do look down at this one, but I can knit a fair amount in the dark.

This cowl is living on my bedside table when it isn't in the car.


I am also working away on a mindless project which quickly grew out of the portable phase. This is the Moderne Baby Blanket (Mason-Dixon Knitting) that I am making for my brother and his wife. Since it is pure garter stitch, the mindless factor is high. I only need to look at what I'm doing when I'm picking up for a new color.

I hope the enjoyment of mindlessness lasts long enough to finish this big guy off.

Thursday, July 7, 2011

Knitting Progress and Redirection


The good news is I have finished almost everything listed in my last post as "current projects". Here is the Universal Scarf in Classic Elite Princess and another in Trekking Fach (leftover from the February Skacel knitalong project).

I also finished the June Trekking knitalong project (some cuffless socks).
Here are the March Rockin' Socks Club socks. I knit Merry Socksters and each sock is slightly different (I didn't notice until I finished the second sock). They are still cute and comfortable.
The only WIP I mentioned last time that is still unfinished is the Pebble Beach top in Classic Elite Sprout. It is, however, about 80% complete. I got impatient and added the scarf at the neckline even though it weighs down the knitting.


Dad's birthday was July 3rd and he always likes a new hat, so I knitted him one from Plymouth Worsted Merino Superwash (denim blue). It is soft and very thick with so much texture.

Although Dad's hat distracted me from my goal of finishing the Pebble Beach top for a few days, the bigger distraction came from my brother. He has been dating Karen for 10 years and introducing her to everyone as his fiancee for the past 8. A few weeks ago they eloped (they are both in their 50s and have been married before, so I guess they decided this time to be a bit more casual). After getting over the shock, I spent at least a week trying to figure out what to get them. I settled on a throw, then spent days going through every book of afghan designs I own. I finally remembered that the Moderne Baby Blanket (from Mason-Dixon Knitting) always looks great and that I had a dozen skeins of Lamb's Pride (5 colors) that I could make it from. I just started block #4 tonight. My goal is to finish it before our family party on July 30th.


Actually, my goal is to finish well before then so I can knit other things this month besides garter stitch!

PS: Spotted some yarnbombing at Menlo School the other day.

Thursday, June 9, 2011

Been busy lately?

I have.

Not just knitting, by the way. May has become almost as big a month for nonprofits as October around here, so I've been running around to events, PLUS all the nonprofits I'm involved with seem to have something big going on. For Peninsula Bridge, we're knee deep in the process of hiring a new executive director. I'm on the hiring committee, and I think we're finally close to making a decision. Our board meetings are also more frequent as we manage this transition. I signed up to be a lead partner (used to be called liaison) for SV2's latest education grantee, Partners in School Innovation, and in addition to what I did in May I have at least 2 more lengthy meetings in the next few weeks (wrapping up the contract and analyzing their fundraising program). I also was involved with the international grant round and am on the consulting team for their grantee, Blue Planet Network. DCP just had their 8th graduation; I announced the scholarship winners (our committee spent numerous hours in April and May evaluating the candidates and making our decisions). Kids in Common was the quietest of my nonprofits (mostly emails and phone calls this month). Dana and I are interviewing a prospective board member on Monday and will be planning the next week's Vision Council meeting agenda as well. Friday of Memorial Day weekend was Menlo School's benefit, and as assistant treasurer I spent many hours posting credit card transactions, making bank deposits, and making sure everything tied out. The money is still coming in, but it should soon slow to a trickle. I'm also on an ad hoc committee of nonprofits, schools, government agencies, funders, and community volunteers working to increase the number of first generation students to graduate from college. We've been at this about a year now, mostly doing research and trying to decide how we could be most effective; a great opportunity dropped into our laps (College Day across all of San Jose Unified School district from kindergarten through 12th grade) and we are now scrambling to make the most of it.

To be able to sleep at night after all this excitement, I have been knitting routinely. Here's what I've done:

Finished the April socks from the Trekking KAL:
I also finished the May socks. It may not be visible here, but the back of the leg is eyelet rib and I mirror imaged the lace design on the top of the foot and front of the leg.

I also finished the Almost Saintly socks.
I made another baby surprise jacket. Joe says I can't give this one to charity, but need to save it for someone who'll appreciate the sophisticated colors.
I also made a few scarves. This is a honey cowl (thanks to Carol Glasstone for alerting me to this lovely design) I made for Joan, the woman I volunteer for at Menlo.

I finally finished the first of four "nano" scarves from Morehouse. These designs are all based on microscopically close color photographs of living things and knit in laceweight single ply merino. The one below is based upon diatoms.

Another cowl, this time in my own lacy pattern in Noro Taiyo (cotton silk blend). It's a good weight for a late spring /early fall accessory.

And finally, a Universal Scarf (Vicky Square design from last week's Knitting Daily post). This is in navy (not the bright blue it seems to be) Crystal Palace Iceland.
What am I knitting now? Another Universal Scarf, this time in mint Classic Elite Princess, the June Trekking socks, the March Blue Moon kit (Merry Sockster socks in Electric Koolaid Acid Test), and a top in lime Classic Elite Sprout (Pebble Beach from a new CE booklet).

Thursday, April 21, 2011

Finally banished the boggarts!

It took awhile.

First, as my friend Suzi put it, I needed a "palate cleanser". Two baby hats and one baby sweater later, I was finally ready to plunge ahead full speed on the March Trekking socks.


This time, I went with needles just a bit smaller than called for, test fit the first sock every few inches, and IT WORKED! I finished the dreaded design a day before the contest deadline and got confirmation from Skacel that I had submitted in time. Here's a snap of the finished socks:


I like this colorway (a gently striped green Pro Natura) better than the suggested yarn (a bright rainbow), and will definitely get a lot of wear from these socks.

Here is a picture of the sock monkey I knit in March (my only FO for the month -- I told you the boggarts were persistent!). As you can see, it is quite large.

I am making progress on other socks now. Here is the first completed Almost Saintly Sock:

The April Trekking Knitalong sock is coming along nicely. I am up to date with the instructions published so far (and yes, I've tried it on). Here's a pic:
Last night I was able to knit and relax with a few knitting friends. I was the only one working on socks. The sweaters, skirt, and baby blanket were all lovely; I think it will soon be time to get back to larger projects.

Of course, there is that Rockin' Sock club March shipment calling to me...

Thursday, March 31, 2011

Boggart attack!

As fans of Harry Potter may remember, boggarts are malevolent household sprites that do things like make milk spoil and steal small items. I have decided that this house has a boggart who took a liking to my March Trekking socks.

I was through the cuff and heel on my fourth try at sock number 1 when I took a good, hard look. The sock was approximately the correct dimensions, but all that ripping and reknitting had seriously compromised the yarn. In a word, it looked ratty. Since I did not think I had enough untouched yarn to knit a fresh pair of socks, I did something I haven't ever done before: I tossed the WIP and its attached yarn in the trash (removed the needles and marker first, of course).

After giving myself a few days to recover, I returned to Green Planet for replacement yarn. They did not have any more March yarn in stock, of course, so I went with a slightly striped Trekking Pro Natura in greens and blues. I cast on for a FIFTH time a few nights ago on size 2.75 mm needles and made it through 2 repeats before going to bed. The next day I picked up my knitting to find that one needle had disappeared. It turns out that the one size of sock length dps I have ZERO extras for (go figure) is 2.75 mm.

I searched for the boggarted needle for two days, knitting (much slower than usual) on three needles before breaking down and buying a new set of needles today. Five repeats into the cuff for sock #1 it finally looks decent.

Wikipedia says if I hang up a horseshoe I can keep the boggart away. I may need to try that.

PS: My output this month was negligible. One sock monkey, half an Almost Saintly Sock, a quarter of a Mondo Cable Cardi (from Noro Retro purchased at Stitches), and a minimal amount of my March Trekking sock. On top of that, I seriously added to my stash at Stitches and the latest Rockin' Sock Club shipment arrived yesterday (Electric Kool Aid Acid Test -- 'nuf said).

Pictures to follow once I actually finish something.

Saturday, March 26, 2011

Three times was NOT the charm

The cuff on version 3 of the sock fit (barely) after a few repeats. It still fit (barely) after a few more.

I then remembered that sometimes socks, even those out of super wash wool, shrink slightly in the washer. Instead of taking the risk of not being able to wear the socks after the first time, I ripped again.

Since the cast on seemed plenty loose, I left it and the initial rows (all garter) intact. My new plan is this:

Cast on, all garter sections, and sole of foot will all be knit on size 2 1/2 mm needles.

Chevron sections will all be knit on size 3 mm needles.

Thus far, I have knit 4 repeats on the cuff. The cast on garter edge no longer ruffles and the circumference is a comfortable 8 1/4". It also stretches more than it did when I knit the same pattern on smaller needles.

I would have been much better off being a blind follower.

Friday, March 25, 2011

Three times a charm?

I decided to participate in all six months of the Trekking knit along sponsored by Skacel. January and February went very well, and were completed without a hitch before month end. The challenge was to finish each by the 15th of the following month. No problem, I thought.

I may have changed my mind.

I started a complex Lucy Neatby sock pattern in late February (a Stitches purchase from Shelridge Farm) as I waited for March to be posted. I was flying through this sock so the knit along would be a snap. No problem.

I cast on for March with the suggested needle size (3 mm), even though that seemed awfully big. The designer said this particular chevron pattern knitted up tightly. My sock cuff was 9 1/2" around without any stretching, so I decided some serious needle reduction was needed. I went down to 2 mm. It looked good, was about 7 1/2" around (smaller than I expected), so I knitted through the heel and started the foot.

I finally got the brains to try it on.

I couldn't. There was zero stretch in this chevron pattern.

I ripped out (AGAIN) and tried with 2 1/2 mm needles. This time the cuff fits (barely) and it isn't as sloppy as the first time.

Wish me luck.

PS: I finished the sock monkey (it is WAY cute), got most of the way through sock number one of the Neatby project, and got several inches below the armpits on a top down cardigan in Noro Retro (another Stitches purchase). All three of those are more complex than these socks, but all have gone much more smoothly. Go figure.